Traction Power & Earthing Upgrades - Phase 1 Works
Transport for Greater Manchester · Awarded
- Buyer
- Transport for Greater Manchester
- Status
- Awarded
- Country
- United Kingdom
- Region
- England
- Sector
- Construction
- Reference
- FaT-ocds-h6vhtk-058dc9
- Published
- 2025-08-26
- Deadline
- 2026-04-18
Tender summary
TfGM has established a contract to ascertain current asset condition information & outline design (Phase 1). At present there are a number of assets (exact extents unknown) which are located within the OCLZ within 1CC that were not electrically bonded when the system was “floated” in 2017. All existing 1CC line-side assets, that fall within the OCLZ, must be assessed against relevant standards and the Metrolink Infrastructure Technical Specification System Earthing Policy to ensure compliance and any identified non-compliances rectified on site.
This is a public summary of a procurement notice. Dates and status reflect the notice held by BidScout; check the full notice before bidding.
Full tender details have a three-minute guest preview for open opportunities. AI insights require registration.
Register for full access