Provision of UPS - MEICA-UPS-01

BIP SOLUTIONS LIMITED · Open

Buyer
BIP SOLUTIONS LIMITED
Status
Open
Country
United Kingdom
Region
England
Sector
Manufacturing
Reference
UK-CF-ocds-b5fd17-8724de8a-4519-4688-9186-05770e349d4e
Published
2026-11-19
Deadline
2026-11-25

Tender summary

The Subcontractor shall design, manufacture, supply, deliver, test and commission 4 No. complete UPS systems: 1 No. at Stoneleigh, 1 No. at Canley Brook and 2 No. at Burton Green. 1. Technical Requirements Each UPS shall be rated at 210 kVA, 400 V, with 4 x 60 kW power modules and N+1 hot-swappable architecture. The Subcontractor shall demonstrate that the required connected load remains supported with one power module unavailable. Requirement Stoneleigh Canley Brook Burton Green Battery sizing load 35 kW 17 kW 70 kW Connected design load 31 kW TBC 66 kW Protection breaker 100 A 100 A 250 A…

This is a public summary of a procurement notice. Dates and status reflect the notice held by BidScout; check the full notice before bidding.

Full tender details have a three-minute guest preview for open opportunities. AI insights require registration.

Register for full access

IT tenders · Construction tenders · Sitemap