Shielding Design
United Kingdom Atomic Energy Authority · Closed
- Buyer
- United Kingdom Atomic Energy Authority
- Status
- Closed
- Country
- United Kingdom
- Region
- England
- Sector
- Professional Services
- Reference
- FaT-ocds-h6vhtk-02c4b4
- Published
- 2021-07-07
- Deadline
- 2026-04-01
Tender summary
The STEP design will include superconducting magnets within its center column which will be subjected to large high-energy neutron fluxes from the plasma. If unprotected, the neutron bombardment of the superconducting magnets results in an operating lifetime of only a few hours. To address this, an in-board neutron shield is needed to reduce the neutron flux reaching the superconducting magnets and prolong their operational lifetime to a viable level.
This is a public summary of a procurement notice. Dates and status reflect the notice held by BidScout; check the full notice before bidding.
Full tender details have a three-minute guest preview for open opportunities. AI insights require registration.
Register for full access