Early Works for the Lower Thames Crossing - North Portal and Tunnelling Spoil Disposal

Highways England · Awarded

Buyer
Highways England
Status
Awarded
Country
United Kingdom
Region
England
Sector
Construction
Reference
FaT-ocds-h6vhtk-02d0fb
Published
2021-08-04

Tender summary

The Lower Thames Crossing project comprises of two bored tunnels beneath the River Thames with interconnecting link roads to the M25, A13 and A2. At 16 metres in diameter, the tunnels will be some of the largest bored tunnels in the world. The crossing will feature three lanes in both directions with a maximum speed limit of 70mph. At circa 2.4 miles each the tunnels will be the longest in the country. The tunnel's north portal site (the "North Portal") will be located on the north shore of the Thames east of the old Tilbury B Power station site and south of the Tilbury loop railway line. The…

This is a public summary of a procurement notice. Dates and status reflect the notice held by BidScout; check the full notice before bidding.

Full tender details have a three-minute guest preview for open opportunities. AI insights require registration.

Register for full access

IT tenders · Construction tenders · Sitemap