S30084 M60 Barton High Level Bridge - Bearing Adjustment - Cat 3 checks for the substructure AIP and GI survey reviews
National Highways Limited · Awarded
- Buyer
- National Highways Limited
- Status
- Awarded
- Country
- United Kingdom
- Region
- England
- Sector
- Professional Services
- Reference
- UK-CFA-ocds-b5fd17-991251a4-d597-4d92-b151-70771e9861fa
- Published
- 2026-07-03
- Deadline
- 2026-04-08
Tender summary
Barton High Level Bridge (BHLB) is an eighteen-span steel-concrete composite structure carrying the M60 over the Manchester Ship Canal. The original bridge, constructed in 1960, comprised two independent deck halves formed from four longitudinal composite girders each, separated by a central reserve joint and supported by reinforced concrete bank seat abutments and hollow-column piers. The bridge was later widened between 1986 and 1989 as part of the M63 improvement works, with new edge girders and an extended deck slab added on both sides. Pre-widening investigations identified slight…
This is a public summary of a procurement notice. Dates and status reflect the notice held by BidScout; check the full notice before bidding.
Full tender details have a three-minute guest preview for open opportunities. AI insights require registration.
Register for full access