UKRI-2862 Installation of Fibre to provide Resilient Connectivity to Underground Areas

UK Research & Innovation · Awarded

Buyer
UK Research & Innovation
Status
Awarded
Country
United Kingdom
Region
England
Sector
Manufacturing
Reference
FaT-ocds-h6vhtk-03a373
Published
2023-02-07
Deadline
2026-04-23

Tender summary

STFC Boulby lab operates at Boulby mine – a working Polyhalite and Salt Mine run by ICL-UK in the North East of England. This optical fibre installation work will install a secondary cable in the main mine shaft and two further cables underground, one attached to the roof of the mine tunnel between the existing laboratory and the new site and the second in a channel in the floor of the mine tunnel between the two locations. This will provide a diverse network with built in redundancy should one cable be damaged.

This is a public summary of a procurement notice. Dates and status reflect the notice held by BidScout; check the full notice before bidding.

Full tender details have a three-minute guest preview for open opportunities. AI insights require registration.

Register for full access

IT tenders · Construction tenders · Sitemap