National Nature Reserves (Natural England) x 9 Major Build Programme
Defra Network eTendering Portal · Closed
- Buyer
- Defra Network eTendering Portal
- Status
- Closed
- Country
- United Kingdom
- Region
- England
- Sector
- Construction
- Reference
- FaT-ocds-h6vhtk-0369a9
- Published
- 2022-09-20
- Deadline
- 2026-03-29
Tender summary
Natural England (NE) wish to upgrade nine of their National Nature Reserve (NNR) bases across England to improve their operational capability and allow them to connect more people with nature. Nine independent projects are currently in varying stages of concept design. There are currently 5 new build schemes, 1 refurbishment scheme, and 3 with an element of both. These are located across England. The majority of the new build elements are based on a modular design, though two are likely to be traditional blockwork. The intention of this PIN is to identify suitable main contractors who are…
This is a public summary of a procurement notice. Dates and status reflect the notice held by BidScout; check the full notice before bidding.
Full tender details have a three-minute guest preview for open opportunities. AI insights require registration.
Register for full access