DNWP0027- Lot 1B / WAGR B55 Demolition - Sellafield - A2R JV
Altrad AtkinsRealis Joint Venture (A2R JV) · Closed
- Buyer
- Altrad AtkinsRealis Joint Venture (A2R JV)
- Status
- Closed
- Country
- United Kingdom
- Region
- England
- Sector
- Construction
- Reference
- UK-CF-ocds-b5fd17-78ed4213-9d0a-4592-888a-9fb536485976
- Published
- 2026-10-26
- Deadline
- 2026-11-10
Tender summary
The B55 and B55.2 demolition project at Sellafield involves the controlled demolition and dismantling of the B55 Office Complex and B55.2 Turbine Hall, located within the WAGR complex, down to existing ground-floor slab level. The scope includes soft stripping, asbestos remediation, high-reach mechanical demolition of the structural frame, cladding and reinforced-concrete floors, together with segregation and processing of demolition arisings, backfilling of voids and final site clearance. A key constraint is Substation 65, which is located within the B55/B55.2 structure and must remain…
This is a public summary of a procurement notice. Dates and status reflect the notice held by BidScout; check the full notice before bidding.
Full tender details have a three-minute guest preview for open opportunities. AI insights require registration.